Professional service for steel material supply
American standard H-beam, British standard H-beam, European standard H-beam, and external standard H-beam
National free consultation hotline
135-0315-6805
1.The first step in the production of H-shaped steel components is setting out and cutting. If the processing quality of the components does not meet the requirements, it will affect the construction operation and cause quality problems in the building. Therefore, the cutting of H-shaped steel must be strictly carried out in accordance with the drawings.
2.There are three main connection methods for H-shaped steel: first, steel welding, second, bolt connection, and third, rivet connection. Welding is the main method in the production of components, and the welding quality of the British standard H-shaped steel is related to the quality of the entire building. Therefore, professional welding personnel are required to complete the welding work, and full welding must be carried out without missing welding.
3. The characteristic of H-shaped steel buildings is prefabricated, and the components processed in the factory are directly transported to the construction site for installation. If there is a problem with the installation quality, it not only greatly reduces the overall project quality, but also may cause on-site construction accidents. Therefore, during installation, it is necessary to follow the process steps to ensure the stability and reinforcement of the H-beam project.
4. The fire and anti-corrosion performance of H-shaped steel is average, so fire and anti-corrosion coatings should be applied well during component processing to avoid uneven film thickness and surface sagging during painting.
Scan for more information
Address: 3678 Xinhua Road, Tianjin Pilot Free Trade Zone (Central Business District)
Unit 1002, 10th Floor, Baofeng Building (New Financial Building)
Website: www.jinxilvjian.com
Popular search: American standard H-beam, British standard H-beam, European standard H-beam